Blue Mall, Santo Domingo, Dominican Republic
Blue Mall in Santo Domingo has a concrete structure with round columns. Our Geotub improved the construction site efficiency, providing the local workforce with lightweight formwork that is easy to install manually. This resulted in a faster construction process compared to heavy steel formwork that depends on the crane availability. Our Geotub proved to be a cost-effective solution that provided an increase in productivity ensuring a good concrete surface quality.
Geotub provided multiple benefits:
- Time- and cost-saving due to less machinery needed to complete the work,
- Lower construction costs due to reusable formwork,
- Lean construction with low waste,
- Sustainability improved with LEED points,
- Safer construction site.
Learn more about the advantages of Geotub:
Geotub projects
Bridge and elevated road improvements with Geotub formwork
Geoplast Build Fast reduces building costs by up to 20%
Geoplast light weight plastic formwork benefits
We made five airports more sustainable